Pump-room headers
Suction and delivery headers set to your pump spacing and flange sizes.
Fire and MEP contractors
Since 1981, Kinetics has made heavy steel pipework. Now, we're bringing it to fire projects: pump-room headers, risers and hydrant mains, measured as built and made under controlled conditions.

What we make for you
The heavy steel sections of a fire water system, in red epoxy, ready to bolt in. Sprinkler branch lines stay with your installers.

Suction and delivery headers set to your pump spacing and flange sizes.

Wet and dry riser sections with landing-valve outlets, repeating floor by floor.

Flanged sections for the ring main and hydrant spurs, cut to measured lengths.

Bends, tees, reducers, and one adjustable closure piece per run to take up the last few centimetres.
Why contractors use it
A quoted price for the pipework instead of open-ended welder days.
Fewer welding permits and less fire risk in occupied or finished buildings.
Each piece pressure-tested and tagged in our factory, so there are fewer failed site tests.
Pieces arrive labelled, with a layout drawing. Your team bolts them together.
How it works
Our fitter measures your pump room, risers and hydrant mains once walls, slab and pumps are in.
Made to the real building, not just the drawing.

Pipe rolled and welded, flanges faced, drilled and welded on, under controlled conditions.
Better welds than overhead site welding in tight shafts.

Each piece is tested with blanks on, then tagged with job, piece and date. Red epoxy finish.
No failed test and rework after installation.

Our truck brings labelled pieces, gaskets, bolts, a layout drawing and valves if you need them. One closure piece adjusts on site.
Less hot work, less time on site, one fixed price.

Our site welders fit the real dimensions.
They do, and we don't try to replace that. We make in the factory only what your equipment and drawings fix: headers set by pump spacing, risers that repeat floor by floor, standard fittings.
The rest we measure as built, once walls, slabs and pumps are in. Every run gets one adjustable closure piece that takes up the last few centimetres on site.
You get factory welds where they matter and site flexibility where you need it.
Valves to match. If you need them, we supply the gate, butterfly and non-return valves for the pump room and risers, drilled to suit our flanges.



Pump-room layout, riser schematic and hydrant main routes are enough to start.
WhatsApp / call 0718 274 742 · [email protected]